Experience
The staff of Waschuk Pipe Line Construction Ltd. is experienced in all aspects of construction as related to:
  • Pumping Stations
  • Oil Batteries
  • Waterflood Plants
  • Compressor Stations
  • Gas Processing Facilities
  • Pipeline Gathering Systems
  • Mainline Pipeline Construction

Pipeline Construction

Waschuk Pipe Line Construction Ltd.'s capabilities range from tie-ins to multi-million dollar projects. The staff is experienced in reworking facilities, as well as start up of new construction.

Waschuk Pipe Line Construction Ltd.'s staff is conversant with permitting procedures required by Government agencies, as they are applicable to all oil and gas production facilities.

Waschuk Pipe Line Construction Ltd. has completed up to 5 major projects at one time. All these projects were completed on budget and on schedule while employing up to 750 people on a weekly payroll basis.

Camp Experience
Year Project Location Description
1982 Gulf Project Robb, AB Operated a 120 man camp for one year while doing 225 miles of 4"-16" pipelines.
1983 Nova Wabasca, AB Operated a 120 man camp, including housing Nova personnel for three months while doing 40 miles of 8" line.
1986 Nova Chinchaga, AB Operated a 120 man camp, including housing Nova personnel for three months while constructing 100 miles of 3", 6" and 12" pipelines.
1988 Nova Lac La Biche, AB Operated a 160 man camp, including housing Nova personnel for 30 days while constructing 76 miles of 12" pipeline.
1992 Nova Loon River, AB Operated a 100 man camp, including housing Nova personnel for 90 days while directionally drilling 1 km of 16" and 1 km of 10" across the Loon River.
1996/97 Nova Rainbow Lake, AB Operated a 500 man camp, including housing Nova personnel for 100 days while constructing 80 miles of 30".
2007 Kinder Morgan Canada (Corridor Pipeline Expansion) 3 loops from Ft. McMurray to Edmonton Currently under construction and will be completed by March 31, 2008.